Recently in Permeables

Pavers Score More Points

Spring 2013

With the upcoming release of LEED v4, some important changes are in store

by David R. Smith

Posted in Interlock-Design | Tagged , | Leave a comment

Learning While Doing

Spring 2013

Challenges faced by pavers

by Peter Fretty

Posted in Interlock-Design | Tagged , , | Leave a comment

All Projects Are Local

Spring 2013

How guerrilla tactics can further the cause of segmental paving

by David R. Smith

Posted in News | Tagged , | Leave a comment

ICPI Releases Tech Spec 18

Spring 2013

Construction of permeable interlocking concrete pavement systems

Posted in News | Tagged , , , | Leave a comment

Staying Power of Pavers

Spring 2013

A 33-year-old Paver installation demonstrates outstanding durability

by Peter Fretty

Posted in Interlock-Design | Tagged , , | Leave a comment

LEED v4 at the Door

Spring 2013

With the upcoming release of LEED v4, some important changes are in store

by David R. Smith

Posted in Interlock-Design | Tagged , , | Leave a comment

Great Expectations

Winter 2013

Creating the new normal, paver by paver

By David Smith

Posted in Interlock-Design | Tagged , , | Leave a comment

MEMORIAL INSPIRES PAVER DESIGN AESTHETIC

Winter 2013

Memorial presented unique design challenges

By Elizabeth Millard

Posted in Interlock-Design | Tagged , , | Leave a comment

A Contractor’s Project Perspective

Winter 2013

contractor recounts challenges

 

Posted in Interlock-Design | Tagged , , | Leave a comment

Remaking a City

Winter 2013

PROJECT 180 TRANSFORMS OKLAHOMA CITY AND PAVERS PLAY A MAJOR ROLE

By Elizabeth Millard

Posted in Interlock-Design | Tagged , , | Leave a comment